by Malisko | Dec 17, 2020 | Announcement, Metals/Mining/Cement
News Release Major Metals Manufacturer Chooses Malisko for OT Network Design St. Louis, Missouri – Malisko Engineering, Inc. has been retained to provide engineering services for three primary OT Networks at a major metal manufacturer in the US. Malisko’s team...
by Malisko | May 19, 2020 | Case Study, Metals/Mining/Cement, Operations, Process Automation, Process Automation Solutions, Quality
Case Study Cement Manufacturer Incorporates Cross Belt Analyzer, Optimized Control to Improve Quality And Consistency Objective Client wanted to increase product consistency and quality while also reducing material clean-up time and downtime due to corrective...
by Malisko | Apr 22, 2020 | Case Study, Metals/Mining/Cement, Operations, Physical Network Infrastructure, Process Automation, Virtualization
Case Study Cement Manufacturer Upgrades OT Server Platform to Increase Uptime Objective A client was experiencing unacceptable downtime due to critical computer servers crashing during their 24×7 operation. Existing servers were not located in a computer-friendly...
by Malisko | Mar 18, 2020 | Analytics/Reporting, Case Study, IIoT, Metals/Mining/Cement, Physical Network Infrastructure, Plant Floor Control, Reporting, Virtualization
Case Study Industrial Network Upgrade Lays IIoT Groundwork for Leading Minerals Producer Background A global minerals producer wanted to implement IIoT at one of their U.S. facilities, and knew they needed help as they were already encountering limitations within the...